This week our group worked on the final report
Below are the specifications for the report
- Letter of Transmittal
- Executive Summary
- Introduction (Luca)
- Background
- Needs Assessment
- Problem Formulation
- Constraints and Criteria
- Proposed Solution
- Design Concepts (Bryan)
- Design Selection Matrix (Josh)
- Final Design Selection (Josh)
- Design
- Distance Sensor Characterization (Bryan)
- Electrical (Bryan)
- Mechanical (Luca)
- Software (Josh)
- Final Design Review
- Schedule and Budget (Bryan, Luca, David)
- Conclusions and Recommendations